Home Capabilities Plant Careers Contact

 

 

 

 

About Us

company Profile

Company Values

People

Health and Safety

Quality

Environment

IT SOLUTIONS

About Us

 

Byzak is a long established (1984), multidisciplinary contractor providing wide ranging construction capability for both public and commercial clients, and specialising in the Water, Environmental and Public Realm sectors. Contracts, undertaken throughout the United Kingdom, are of all types, including conventional admeasurement, lump sum, design and construct, target cost and professional services.

Byzak’s capabilities include:

Treatment works

MEICA works           

Shafts, Tunnels & Pipejacks

CSOs & Storage tanks

Earthworks & Landscaping

Reinforced concrete structures

Drainage & Sewer rehabilitation

Contaminated Land & Reclamation

Piling & Foundations  

Water mains

Grouting & Geotechnical

Roads & Pavements

Pumping stations

Slope stabilisation & Bank protection

Bridges & Retaining walls

Reservoirs               

Lagoons & Reed beds

Utilities/ Trenchless methods

Process plant

Habitat protection    

Electrical/Mechanical installations

Outfalls & River works

Sheet piling & Flood embankments

Steel fabrications

Commissioning/Training

Flood control structures

Building & Building services

 

 

Pump Control Innovation

 

Before Retroflo

After Retroflo

 

 

Retroflo is an innovative intelligent pump control system offering optimal sewage pumping performance resulting in improved efficiencies and greater operational reliability which in turn help water companies meet needs for energy savings and reduced operating expenditure (OPEX).

 

Working closely with Northumbrian Water on investment and operational issues Byzak adopted a new approach for managing the complete pumping process within a sewage pumping station rather than directing attention  to items of equipment.  The innovatory (patented) features of the Retroflo system allow characteristics of pumps (power, torque and current) to be monitored across the full range of wet-well levels and pump speeds.  No other available system adopts this approach, nor has the capacity for control to provide optimal performance.

 

The new control system has been developed with the support of Northumbrian Water through Byzak’s Minor Works framework contract for Pumping Station Refurbishment.

 

For more details on Retroflo, please visit the website www.retroflo.com

 

Byzak Northwest Office Secure UU Framework

 

 

Byzak has secured its first framework with United Utilities


The Minor Works Alliance Framework (Northwest) is initially for a 2 year period to 2010, with the possibility of extensions to 5 years.

 

Byzak, one of four appointed contractors, has been assigned the Manchester area. Harry Kaye has been appointed as the Framework Manager with Peter Robinson as Contracts Manager.

The work will involve civil engineering, and mechanical and electrical engineering to be carried out across the full range of United Utilities facilities, broadly similar to Byzak's current Minor Works/SVCP frameworks with Northumbrian Water and Scottish Water.

Harry Kaye commented:
"This appointment is important for the future development of Byzak North West and aligns well with predicted future water industry workload needs for multi-disciplinary teams to improve the efficiency of existing assets."

For further information on the Framework, please contact Harry Kaye on 0161 746 3200

 

The Italian Job!

 

 

Byzak are providing Plant Services in the Alps

 

Byzak are  providing Plant Services to Nacap B.V. and ICOP (JV) for the construction of a gas line from Tarvisio area to southern village of Malborghetto by SNAM Rete Gas.  The Project includes the replacement of an existing DN900 (36”) line with a new DN1220 (48") line to increase the transport capacity for gas imported from Russia.


The pipeline starts right at the border with Austria and near the border with Slovenia; this feature led to name this area as “Dreilaender Ecke”; the route runs through a dense forestry land which is a protected area. In order to cause the minimum disturbance to the environment a significant part of the 19,7 Km pipeline will be inserted in the 7 so called “microtunnels”..

 

Byzak are providing an upsized AVN 2000D Tunnelling Machine along with a specialist operations team.
 

For more information please go to our News page


Should you have any comments or queries about this site please email: enquires@byzak.co.uk